The City of Lakeville Street Division had been rehabilitating many storm sewer structures and catch basins, but lacked an efficient system for transporting the necessary tools, materials and equipment. The solution was to retrofit a 15,000-lb. trailer, with all the necessary items, including a service crane and traffic control devices, and simply hook it up as needed to a single truck for transport to project sites.
Date produced: September 2011