• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

LRRB

Minnesota Local Road Research Board

  • About LRRB
    • Annual Report
    • Background
    • Funding & Oversight
      • Committee Structure
      • Board Structure
    • Get Involved
    • Meeting Dates
    • Research Cycle
    • Brand Guide
  • Research
    • Search Active and Completed Research
    • Check the Status of Your Research Idea
  • News
    • Latest News
    • Research Radar webinar series
    • Newsletters
    • Partner Updates
  • Resources
    • Guidebooks, Manuals, Videos
    • MnDOT Library
    • Local Technical Assistance Program (LTAP)
    • Local Operational Research Assistance (OPERA) Program
  • Contact Us
    • Board & Committee Members
    • Local and National Research Partners
    • Submit Research Ideas
  • Member Login

Jackson County adapts bridge approach transition curb for retrofits

September 12, 2018 by Shannon Fiecke

Washout erosion along the wing walls of bridges has been a persistent problem for many local agencies. To address the problem, the Jackson County Public Works Department developed a bridge approach transition curb that has been included on all new bridge construction for the last 10 years. The extended curb design protects the area immediately behind the wing walls by reducing the intensity of stormwater runoff and gradually channeling it further away from the structure to a less erosion-prone area.

The success of the bridge approach transition curb on new bridges inspired Jackson County public works staff to adapt the design for the many bridges in the county older than 10 years. Jackson County received a $5,000 grant through the Minnesota Local Road Research Board (LRRB) Local Operational Research Assistance (OPERA) Program to develop a process for adding the feature to existing bridges, including the design and fabrication of reusable custom metal forms for each corner of a bridge.

Maintenance activity on a bridge curb
Jackson County developed a bridge approach transition curb.

Jackson County views the process of retrofitting the curb to existing bridges as a good short-term, fill-in project for maintenance staff. They estimate retrofitting one bridge takes five maintenance workers one full day and two subsequent half-days. The cost for labor, equipment, and materials for these improvements to each bridge total approximately $7,500 using the specialty metal forms made as part of the OPERA grant.

So far, Jackson County has retrofitted two bridges with the approach transition curb. The county plans eventually to retrofit all bridges on paved roadways, prioritized by worst condition first. Public works staff continue to monitor the performance of the improvements for any needed adjustments.

Jackson County intends to share the process and the specialty forms for retrofitting bridges with approach transition curbs with other local agencies upon request.

-This article originally appeared in the September issue of the LTAP Technology Exchange.

WATCH VIDEOS
and read more about OPERA projects:
mnltap.umn.edu/opera

 

Filed Under: Latest News (Home Page), News Tagged With: OPERA, bridge maintenance, featured

Primary Sidebar

Search LRRB Research

Search active and completed LRRB and MnDOT research projects.

Find a project

Footer

linkedin icon youtube icon wordpress icon | Privacy Policy